Gemini South Wind (Operating) Test Information

Tests

  • 44 Tests
    • 4 initial setup
    • 40 with wind data
      • 16 arranged into an L16 array
      • 18 arranged into two L9 arrays
      • 1 with wind screen raised
      • 2 Cross wind tests
      • 4 Elevation sweep (one is part of L16)

Results

  • Structural results compared with modal test in the MACL Report (in PDF format), at the PDF bookmark 'Operating Test Report'.
  • Wind data results on this CD