Gemini South Wind (Operating) Test Information
Tests
- 44 Tests
- 4 initial setup
- 40 with wind data
- 16 arranged into an L16 array
- 18 arranged into two L9 arrays
- 1 with wind screen raised
- 2 Cross wind tests
- 4 Elevation sweep (one is part of L16)
Results
- Structural results compared with modal test in the MACL Report (in PDF format),
at the PDF bookmark 'Operating Test Report'.
- Wind data results on this CD
|