Feb |
| PM - Primary / Tertiary Mirror (Hand Wash) |
| | PM - PMS Heat Exchanger Checks PM - Comp Rm UPS - New Batteries |
| | Bench - Accelerometer Tests |
| |
|
| | | 1:00pm - 4:00pmExtended calibrations - DH |
4:00pm - 5:30pmWIYN tour - Allen/Blum |
| Dry Air System 120 Gal Tank Installed |
| | |
Mar |
| | | EM - MOS port rotator power upgrade |
8:00am - 2:00pmWNIR rotator encoder - JDonaldson |
| 9:00am - 3:00pmODI cooldown (RC/BH) |
| | WIYN Science Team (Rajagopal) |
|
|
WIYN Science Team (Rajagopal) |
| Instrument Change - Remove Hydra |
| Azimuth LVDT / Load Cell Upgrade |
IAS / WHIRC / WTTM - Install |
Instrument Change - Install IAS/WHIRC/NESSI |
| Bench Accelerometer Tests (NEID) |
TCS upgrade (Pointing Parameters) |
| 9:00am - 2:00pmODI flats - Wilson/Daniel |
| | |
|
| ODI - Dry Air System Check / Repair |
| ODI Dry Air Check / Repair ODI Chiller Repair |
| | | ODI Focal Plane Element Checks |
9:00am - 3:00pmODI Heater tests - Harbeck/Gott |
| |