Apr |
| | NEID Facilities DDR and Tour |
| | | | |
May |
| | HEXPK removal/GDPK install |
| | | | |
|
| | | M1 Load Cell Checks (Calibration) |
| | | 10:00am - 3:00pmSite tour - Visitor Center |
|
|
| Dry Air Leak Checks (Fac) |
| | | Dry Air Adjustment - Pre ODI Cooling |
M1 Alum. Special Equip. Checkout |
M1 Cart Checkout (4-Meter Obs.) |
ODI cooldown TBD - EM/Wilson |
| ODI cooldown TBD - EM/Wilson |
| |
|
| IAS removal/Hydra install |
| T&E - Azimuth Alignment / Balance |
IAS removal/Hydra install |
| Hydra gripper tuning - Rob/Erik/Emily |
| 8:30am - 2:00pmHydra checkout - Di/Heidi/Wilson |
9:00am - 2:00pmODI flats - Wilson |
| | |
Jun |
WIYN HouseJeffrey Gerber, Nick Barth, Ralf Kotulla, Ian Norwood |
| WIYN HouseJeffrey Gerber, Nick Barth, Ralf Kotulla, Ian Norwood |
| WIYN HouseJeffrey Gerber, Nick Barth, Ralf Kotulla, Ian Norwood |
| WIYN HouseJeffrey Gerber, Nick Barth, Ralf Kotulla, Ian Norwood |
| WIYN HouseJeffrey Gerber, Nick Barth, Ralf Kotulla, Ian Norwood |
| Hydra-set / Crossbar Lifting Load Cell (Calibrations) |
WIYN HouseRalf Kotulla, Ian Norwood |
| WIYN HouseRalf Kotulla, Ian Norwood |
|