Feb | Mar |
| | | EM - MOS port rotator power upgrade |
8:00am - 2:00pmWNIR rotator encoder - JDonaldson |
| 9:00am - 3:00pmODI cooldown (RC/BH) |
| | WIYN Science Team (Rajagopal) |
|
|
WIYN Science Team (Rajagopal) |
| Instrument Change - Remove Hydra |
| Azimuth LVDT / Load Cell Upgrade |
IAS / WHIRC / WTTM - Install |
Instrument Change - Install IAS/WHIRC/NESSI |
| Bench Accelerometer Tests (NEID) |
TCS upgrade (Pointing Parameters) |
| 9:00am - 2:00pmODI flats - Wilson/Daniel |
| | |
|
| ODI - Dry Air System Check / Repair |
| ODI Dry Air Check / Repair ODI Chiller Repair |
| | | ODI Focal Plane Element Checks |
9:00am - 3:00pmODI Heater tests - Harbeck/Gott |
| |
|
| Dry Air System Relocation Checkout ODI N2 Backup Checks |
| | Bench - Fiber/Cabling Rerouting Checks |
Bench Automation Checks (Software) |
| | | |
Apr |
| | 11:00am - 4:00pmODI flats - Wilson/Daniel |
WIYN HouseMarat Musin, Zhiyuan Ma, Chenxiaoji Ling |
| WIYN HouseMarat Musin, Zhiyuan Ma, Chenxiaoji Ling |
| Primary / Tertiary Lifting Equip. Checks |
WIYN HouseMarat Musin, Zhiyuan Ma, Chenxiaoji Ling |
| 9:00am - 12:00pmODI flats - Wilson |
WIYN HouseMarat Musin, Zhiyuan Ma, Chenxiaoji Ling |
| WIYN HouseMarat Musin, Zhiyuan Ma, Chenxiaoji Ling |
|
|
| | ODI filter change - Brent/Paul |
| T&E WTTM / Pointing / Wavefronts |
| T&E Tracking / Wind Shake / Primary - Secondary Tests |
| | 10:30am - 2:30pmWIYN Tour - Valdes |
|