WIYN Activities & Observing Calendar
Contact heidis@noao.edu for conflicts
June/July 2017
SundayMondayTuesdayWednesdayThursdayFridaySaturday
18Jun192021222324
NOAO
Hardegree-Ullman
Hydra
OA: Anthony
M1 Mirror Cart Checkout
NOAO
Hardegree-Ullman
Hydra
WIYN House
Con Deliyannis
OA: Anthony
M1 Mirror Cart, Load Cell Checkout
WIYN Science Team
OS: self-start
WIYN House
Con Deliyannis
OA: Anthony
Wisconsin
Rosenwasser
OS: Harmer
Remote
WIYN House
Con Deliyannis
OA: Amy
Wisconsin
Rosenwasser
Hydra
Remote
WIYN House
Con Deliyannis
OA: Amy
Wisconsin
Rosenwasser
Hydra
Remote
WIYN House
Con Deliyannis
OA: Christian
NOAO
Smith
OS: Willmarth
OA: Dave
2526272829301Jul
NOAO
Smith
Hydra
OA: Dave
M3 and A-Frame Removal
Shutdown
M1 and M1 Mirror Cell Removal
Shutdown
M1 Removed from M1 Cell - Transport to 4-Meter
Shutdown
M1 Inspection
M3 removed from M3 cell - transport to 4-Meter
Shutdown
M1 Mirror Cell - cleaned
M1 stripped and washed at 4-Meter
Shutdown
Shutdown
2345678
Shutdown
M1 Aluminized
Shutdown
Shutdown
M1 Stored in Chamber
Shutdown
M1 Stored in Chamber
Shutdown
M1 Repairs by UA and NOAO staff
Shutdown
Shutdown
9101112131415
Shutdown
M1 installed onto M1 Mirror Cell
M1 transport to WIYN obs.
Shutdown
M1 and M1 Mirror Cell Installation
Shutdown
M3 Installed onto M3 Mirror Cell
Shutdown
A-frame, M3 and M3 Mirror Cell installed
Telescope Balancing and Checkouts
Shutdown
IAS Cabling
M1 and M3 Collimation
Shutdown
M1 and M3 Collimation
Shutdown
OA: Christian
16171819202122
Shutdown
OA: Christian
M1 and M3 Collimation
WHIRC Installed
T&E
OA: Christian
M1 and M3 Collimation
Telescope Observing (Dome Closed)
WHIRC and WTTM Cables installed
T&E
OA: Anthony
Azimuth / Elevation Balancing
ODI Electronics Boxes and Cryostat Installed
T&E
OA: Anthony
Facilities Contract - Site Visit
ODI Cabling and Pump out
WHIRC Cooldown
T&E
OA: Anthony
ODI Cooldown
T&E
OA: Doug
T&E
Shared Risk Use
WHIRC
OA: Doug