Oct |
| elevation balance and azimuth level verified (no changes made) |
| drive alignment checked (paper test) |
secondary actuator assembly bolts tightened |
| | | | |
Nov |
| | | elevation tachometers cleaned |
WIYN HouseAdriana Durbala, Rebecca Koopman, Alyana Poulin |
| | | |
|
| | 2:00pm - 4:00pmWIYN tour - BBuckingham |
| | | | |
|
| | | Bench mechanization work window |
Instrument Change - Hydra Removal |
Control room+ flooring install |
| Bench mechanization work window |
Instrument Change - install IAS, WHIRC/WTTM |
Control room flooring cont'd |
| bench az stage lubricated |
Bench mechanization work window |
| |
|
| Bench mechanization work window |
| Bench mechanization work window |
| Bench mechanization work window |
| | | |