Oct |
NESSI software testing @ night in Lab area - MarkE/NicS |
WIYN HouseCatherine Pilachowski |
| WIYN HouseCatherine Pilachowski |
| Collimation Checks and Adjustments |
| Computer Room Network Changes |
IAS removal/Hydra install |
| Az 1 Encoder Constant (Updated) |
Hydra Instr. Initial Checkout |
IAS removal/Hydra install |
| Hydra checkout - Willmarth/Everett |
| |
|
Vibration Tests / Tracking / Pointing Ver. |
| | | | | 10:00am - 12:00pmWIYN tour - VC |
| |
|
| WIYN HouseAdriana Durbala, Sarah Parker |
| | 8:00am - 2:00pmHydra over lift - Harmer |
| | | |
|
| 2:00pm - 5:00pmExtended calibrations (Di/Susan) |
| 2:00pm - 5:00pmExtended calibrations (Dave) |
| 2:00pm - 5:00pmExtended calibrations (Christian) |
| | | |
Nov |
| Elevation Drive Checkout and Balance |
2:00pm - 5:00pmExtended calibrations (Di/Susan) |
| 2:00pm - 5:00pmExtended calibrations (Christian) |
| Azimuth Drive Repair (Power Amps) |
| Pointing 2-Maps Open Loop Test |
| | |