GNIRS PRE-FAB REVIEW

May 11, 2000
 

The purpose of the GNIRS Pre-Fabrication Review is to demonstrate to our customer, Gemini, that the design approach of the instrument critical assemblies (optical benches and mechanisms) is sound, and will meet the basic requirements of the FPRD.

The following is a preliminary list of items to be addressed at the GNIRS Pre-Fabrication Review.  As previously agreed to by Gemini, this will be a technical review focusing primarily on the solid models of the optical bench assemblies, results of the gravity deflection/flexure and thermal analyses, and the results of our prototype risk reduction effort. We also plan to present the results of our cold motor testing, the software plan, an overview of schedule progress, plans for fabrication, and identification of pertinent milestones.  Missing from the list below are such things as Introduction, etc., which will be added later as we refine the agenda.

PRELIMINARY AGENDA

Date      Time      Subject                                                     Presenter

May 11:
                 0830     Introduction, opening statements                 Sidney/Neil
                                Project Status                                           Neil
                 0930      Technical presentation:  Introduction           Jay
                                Critical Requirements                                Jay
                                Risk Reduction Overview                         Jay
                1000        Break
                1015        Bench Design
                                    - Configuration/Overview/Description    Gary
                                    -  Detailed Description                          Gary
                                    -  Fabrication and Design                      Gary
                                    -  Analysis                                            Ed
               1200         Lunch
               1300         Thermal Analysis                                      Jay
               1330         Mechanism Risk Reduction                      Jay
               1430         Optics Risk Reduction                             Dick
               1500         Other Risk Reduction                              Jay
               1515         Break
               1530         Software                                                Richard
               1630         End of technical presentations
 
May 12:
              0900         GNIRS management                               Neil/Dan
              1100         End/Gemini caucus period
              1200         Lunch
 
 
 

Preliminary Presentation (pdf file)Preliminary Presentation (ppt file)



If you have any questions or suggestions regarding this website, please contact Melissa Bowersock.


 
NOAO Intranet Services
NOAO Copyright
 Statement

National Optical Astronomy Observatories, 950 North Cherry Avenue, P.O. Box 26732, Tucson, Arizona 85726,
Phone: (520) 318-8000, Fax: (520) 318-8360