Document Number Status Document Title Rev Modified
1000-AD-015-0001 Released LOCKOUT TAGOUT (LO/TO) SOP - 1/17/2017 07:11:30
1000-AD-015-0002 Released CRYOGENICS SOP - 1/17/2017 07:13:26
1000-AD-015-0003 Released FALL PROTECTION PLAN SOP - 2/16/2017 07:58:14
1000-AD-015-0004 Released RESCUE PLAN SOP - 2/16/2017 08:38:04
1000-AD-015-0005 Released CONFINED SPACES SOP - 4/21/2017 08:15:38
1000-AD-015-0006 Released MERCURY RESPONSE SOP - 4/21/2017 08:12:18
1000-AD-015-0007 Released WORK PLANNING AND JOB HAZARD ANALYSIS (JHA) SOP - 4/21/2017 10:38:02
1000-AD-015-0008 Released PERSONAL PROTECTIVE EQUIPMENT (PPE) SOP - 4/21/2017 10:37:08
1000-AD-015-0009 Released FIRE EXTINGUISHER AND EMERGENCY EVACUATION SOP - 6/23/2017 13:39:02
1000-AD-015-0010 Released CRANES SOP B 10/16/2018 15:51:39
1000-AD-015-0011 Released LEAD WEIGHT AWARENESS SOP - 11/15/2017 07:04:44
1000-AD-015-0012 Released STOP WORK POLICY & PROGRAM - 9/29/2017 22:11
1000-AD-015-0013 Released POWERED INDUSTRIAL TRUCK POLICY - 10/20/2017 09:14:28
1000-AD-015-0014 Released SLIPS, TRIP & FALLS POLICY - 10/20/2017 09:16:36
1000-AD-015-0015 Released ELECTRICAL SAFETY POLICY - 10/31/2017 09:24:50
1000-AD-015-0016 Released BLOODBORNE PATHOGEN SAFETY POLICY - 10/05/2017 07:33:28
1000-AD-015-0017 Released HOT WORK SAFETY POLICY - 10/05/2017 07:34:56
1000-AD-015-0018 Released HEAT/COLD STRESS AWARENESS POLICY - 10/20/2017 09:24:27
1000-AD-015-0019 Released CONDUCTING SAFETY REVIEW FOR KITT PEAK VISITORS/OBSERVERS A 08/23/2018 13:24:23
1000-AD-015-0020 Released WORKING AT ALTITUDE AWARENESS POLICY - 10/30/2017 19:09:25
1000-AD-015-0021 Released PREVENTION OF CARBON MONOXIDE POISONING POLICY - 10/31/2017 14:22:24
1000-AD-015-0022 Released ERGONOMICS AWARENESS POLICY - 10/31/2017 14:24:34
1000-AD-015-0023 Released ENVIRONMENTAL, HEALTH & SAFETY POLICY - 10/31/2017 14:24:34
1000-AD-015-0024 Released ASBESTOS AWARENESS POLICY - 10/31/2017 14:24:34
1000-AD-015-0025 Released HOUSEKEEPING POLICY - 11/07/2017 06:42:39
1000-AD-015-0026 Released GENERAL SAFETY FOR OFFICE WORKERS - 11/15/2017 09:50:28
1000-AD-015-0027 Released LADDERS AND SCAFFOLDING SOP - 11/27/2017 16:06:36
1000-AD-015-0028 Released GLOBALLY HARMONIZED SYSTEM (GHS) SOP - 11/21/2017 10:46:51
1000-AD-015-0029 Released COMPRESSED GASES SOP - 01/08/2018 11:54:10
1000-AD-015-0030 Released LASER SAFETY AWARENESS SOP - 03/08/2018 13:21:06
1000-AD-015-0031 Released NOAO-N Environmental, Health & Safety Manual - 03/08/2018 13:17:56
1000-AD-015-0032 Released Safe Use of Acid Solutions SOP - 04/11/2018 14:12:09
1000-AD-015-0034 Released Kitt Peak Emergency Manual A 06/12/2018 09:40:08
1000-AD-015-0035 Released NOAO-N Bypass Procedures for Safety Interlocks & E-Stops - 10/16/2018 15:46:40
2000balance2m informal 2m Balancing na 7/7/2015
2000-AD-015-0024 Released 2m PRIMARY MIRROR SUPPORT BALANCING PROCEDURE - 2/27/2017 8:54
2100-AD-015-0002 Released 50 Ton Actuator Installation Plan: 4 Meter Mirror Elevator A 3/22/2016 19:59
2100-AD-015-0004 Released 4m Optics Cleaning Procedure - 4/14/2015 8:12
2100-AD-015-0005 Draft/Revision Mayall 4M Primary Mirror Removal and Installation Procedure UNDER REVISION B 1/5/2018 19:36:44
2100-AD-015-0005-JHA Draft/Revision Mayall 4M Primary Mirror Removal and Installation Procedure UNDER REVISION - 1/23/18 15:26:52
2100-AD-015-0005-CLP1 Draft/Revision Mayall 4M Primary Mirror Removal and Installation Procedure UNDER REVISION - 1/23/18 15:26:52
2100-AD-015-0006 Released 4m Summer Shutdown Schedule - 4/14/2015 8:15
2100-AD-015-0007 Released Mayall 4m Post Shutdown Telescope Checkout - 4/14/2015 15:16
2100-AD-015-0009 Released Mirror Elevator Ball Nut Replacement Procedure - 4/14/2015 8:18
2100-AD-015-0010 Released Dewar Filling Procedure A 6/9/2016 10:55
2100-AD-015-0010-JHA Released Dewar Fills - 3/1/2016 15:52
2100-AD-015-0012 Released 4m Dec Drives Removal Procedure - 3/28/2016 15:24
2100-AD-015-0013 Released 4 Meter Cass Cage Bottom Removal Procedure A 6/9/2016 15:19
2100-AD-015-0013-JHA Released 4 Meter Cass Cage Removal - 3/28/2016 8:29
2100-AD-015-0014 Released Mayall Upper Dome Shutter Drive Gearbox Replacement Procedure - 4/5/2016 14:42
2100-AD-015-0014-JHA Released 4M UPPER DOME SHUTTER: GEARBOX REPLACEMENT - 4/5/2016 21:40
2100-AD-015-0015 Released 4 Meter Cass Cage Bottom Installation Procedure - 7/26/2016 11:20
2100-AD-015-0015-JHA Released 4 Meter Cass Cage Installation - 7/26/2016 11:20
2100-AD-015-0016 Released 4 Meter Telescope Balancing Procedure A 6/9/2016 16:24
2100-AD-015-0017 Released MOSAIC Installation Procedure - 7/26/2016 12:43
2100-AD-015-0017-JHA Released MOSAIC INSTALLATION PROCEDURE - 8/17/2016 9:20
2100-AD-015-0019 Released Secondary Major Flip F/8 to Prime Focus Procedure (no instrument) A 7/29/2016 8:45
2100-AD-015-0019-JHA Released Sec Mjr Flip f/8 to PF: No Instrument Installed at PF Procedure - 7/29/2016 8:10
2100-AD-015-0020 Released MOSAIC Removal Procedure - 7/29/2016 9:41
2100-AD-015-0020-JHA Released MOSAIC REMOVAL PROCEDURE - 7/29/2016 9:37
2100-AD-015-0021 Released Secondary Major Flip F/8 to Prime Focus Procedure - 3/8/2016 10:56
2100-AD-015-0021-JHA Released Sec Mjr Flip f/8 to PF with Mosaic Installed at PF Procedure - 3/8/2016 10:56
2100-AD-015-0022 Released Secondary Major Flip Prime Focus to F/8 Procedure - 5/11/2016 13:25
2100-AD-015-0022-JHA Released Sec Mjr Flip from PF to f/8: No Instrument Installed at PF Procedure - 5/11/2016 13:25
2100-AD-015-0023 Released Secondary Major Flip Prime Focus to F/8 Procedure A 3/23/2016 8:05
2100-AD-015-0023-JHA Released Sec Mjr Flip from PF to f/8 with Mosaic Installed at PF Procedure A 3/23/2016 8:05
2100-AD-015-0024 Released NEWFIRM Installation Procedure A 7/29/2016 10:53
2100-AD-015-0024-JHA Released NEWFIRM Installation A 7/29/2016 10:53
2100-AD-015-0025 Released NEWFIRM Removal Procedure - 3/8/2016 11:58
2100-AD-015-0025-JHA Released NEWFIRM Removal - 3/8/2016 11:58
2100-AD-015-0026 Released 4 Meter Rotator/Guider Installation Procedure - 7/24/2017 15:17
2100-AD-015-0026-JHA Released 4 Meter Guider / Rotator Installation - 7/24/2017 15:17
2100-AD-015-0027 Released 4 Meter Rotator/Guider Removal Procedure - 7/25/2017 15:34
2100-AD-015-0027-JHA Released 4 Meter Rotator/Guider Removal Procedure - 7/25/2017 8:39
2100-AD-015-0028 Released KOSMOS Installation Procedure - 7/26/2016 8:16
2100-AD-015-0028-JHA Released KOSMOS Installation - 7/26/2016 15:16
2100-AD-015-0029 Released KOSMOS Removal Procedure - 7/29/2016 14:17
2100-AD-015-0029-JHA Released KOSMOS Removal - 7/29/2016 14:19
2100-AD-015-0030 Released 4m Mayall SE Annex Safety Rail Upgrade - 5/11/2016 14:15
2100-AD-015-0030-JHA Released 4M SE ANNEX SAFETY RAIL REPLACEMENT - 5/11/2016 14:15
2100-AD-015-0031 Released 4m Dec Axis Counterweight Removal: Disassembly: Maintenance: & Reinstallation Procedure - 2/11/2016 14:22
2100-AD-015-0031-JHA Released 4M DEC Axis Counterweight Removal: Disassembly: Maintenance & Installation Procedure - 2/26/2016 13:30
2100-AD-015-0032 Released ProtoDESI Installation Procedure B 6/1/2016 10:55
2100-AD-015-0032-JHA Released ProtoDesi Installation Procedure JHA A 3/28/2016 12:10
2100-AD-015-0034 Released Mayall 2015 Summer Shutdown Schedule - 7/29/2016 14:22
2100-AD-015-0036 Released 4 Meter Hexahedron Inspection - 3/30/2016 15:45
2100-AD-015-0036-JHA Released Hexahedron Inspection - 3/30/2016 15:45
2100-AD-015-0039 Released DESI/Mayall 4m Upper Secondary Ring Procedure for Locating and Pinning A 03/16/2018 11:05:55
2100-AD-015-0039-JHA1 Released DESI/Mayall 4M Upper Secondary Ring JHA For Locating And Pinning A 02/01/2018 14:44:32
2100-AD-015-0040 Released 4M Secondary Flip Ring Assembly Removal - 9/19/2017 16:27
2100-AD-015-0040-JHA Released 4M Secondary Flip Ring Assembly Removal - 9/19/2017 16:27
2100-AD-015-0041 Released Selecting Between 4 Meter Hydraulic Pumps Procedure - 4/5/2016 14:20
2100-AD-015-0043 Released Mayall ProtoDESI Balance - 8/4/2016 14:07
2100-AD-015-0047 Released Modification to Large Coude Room for DESI Fiber Penetrations A 6/23/2017 14:03
2100-AD-015-0047-JHA Released Modifications to Large Coude Room for Fiber Penetrations - 4/21/2017 8:08
2100-AD-015-0048 Released Lifting DESI Upper Ring from Ground Floor to Main Floor in Mayall 4M Telescope - 10/3/2017 14:35
2100-AD-015-0048-JHA Released Lifting DESI Upper Ring from Ground Floor to Main Floor in 4M Telescope - 10/3/2017 14:37
2100-AD-015-0049 Released DESI Dec Wrap Up Installation - 04/06/2018 13:19:58
2100-AD-015-0049-JHA Released DESI Dec Wrap Up Installation - 04/06/2018 13:18:50
2100-AD-015-0050 Released Relocation of Newfirm Helium Lines from Dome Wall inside Coude Room B 1/18/2017 13:21
2100-AD-015-0050-JHA Released JHA for Removing NEWFIRM Helium Lines from Coude Room Wall - 12/2/2016 9:46
2100-AD-015-0051 Released Removal of FFT Spectrograph Support Pedestals and 500 lb Crane from 4m Coude Room - 5/25/2017 9:29
2100-AD-015-0051-JHA Released JHA for Removing Pedestals from Coude Room - 12/2/2016 9:47
2100-AD-015-0052 Released 4m Main Floor Hatch Removal Procedure - 2/6/2017 14:05
2100-AD-015-0052-JHA Released 4M MAIN FLOOR HATCH REMOVAL PROCEDURE - JHA - 2/16/2017 8:54
2100-AD-015-0052-CLP Released CRITICAL LIFT PLAN, MAIN FLOOR HATCH REMOVAL PROCEDURE - 2/05/2018 18:37:32
2100-AD-015-0055 Released PROCEDURE FOR REMOVING AND STORING 4M DOME AIR MIXING FAN (B-29 FAN) DURING DESI INSTALLATION - 12/7/2016 11:38
2100-AD-015-0055-JHA Released JHA for Removal and Storage of Dome Air Mixing (B-29) Fan - 12/7/2016 11:39
2100-AD-015-0056 Released PROCEDURE FOR LIFTING 60 FT PERSONNEL LIFT FROM GARAGE TO C-FLOOR IN MAYALL TELESCOPE A 12/14/2016 10:38
2100-AD-015-0056-CLP Released CRITICAL LIFT PLAN FOR LIFTING 60 FT PERSONNEL LIFT FROM GARAGE TO C-FLOOR IN MAYALL TELESCOPE A 12/16/2016 13:33
2100-AD-015-0056-JHA Released JHA FOR LIFTING 60 FT PERSONNEL LIFT FROM GARAGE TO C-FLOOR IN MAYALL TELESCOPE - 12/13/2016 13:26
2100-AD-015-0057 Released Procedure for Removal of Pre-DESI East Side Declination Cable Wrap from Mayall Telescope - 6/23/2017 14:06
2100-AD-015-0057-JHA Released Removal of Pre-DESI Declination Cable Wrap - 6/23/2017 14:07
2100-AD-015-0058 Released Removal of the F/8 Secondary from the 4M Prime Focus Assembly - 9/19/2017 16:12
2100-AD-015-0058-JHA Released Removal of the F/8 Secondary from the 4M Mayall Prime Focus Assembly - 9/19/2017 16:13
2100-AD-015-0059 Released Procedure for the Installation and Removal of Zenith Stay Bar on the 4 Meter Mayall Telescope - 3/8/2017 10:33
2100-AD-015-0059-JHA Released Installation and Removal of Zenith Stay Bar - 3/8/2017 10:29
2100-AD-015-0060 Released Removing the MOSAIC Prime Focus Corrector from the 4m Mayall Telescope - 10/30/2017 20:21:06
2100-AD-015-0060-JHA Released Removing the Mosaic Prime Focus Corrector - 10/30/2017 20:19:04
2100-AD-015-0061 Released Disassembly and Removal of Top Portion of Central Baffle Stack from 4m Mayall Telescope - 01/30/2018 16:00:59
2100-AD-015-0061-JHA Released Disassembly and Removal of Top Portion of Central Baffle Stack from 4m Mayall Telescope - 01/30/2018 16:00:59
2100-AD-015-0061-CLP1 Released Disassembly and Removal of Top Portion of Central Baffle Stack from 4m Mayall Telescope - 01/30/2018 16:00:59
2100-AD-015-0061-CLP2 Released Disassembly and Removal of Top Portion of Central Baffle Stack from 4m Mayall Telescope - 01/30/2018 16:00:59
2100-AD-015-0066 Released 4m SE Annex Stay Bar Installation and Removal Procedure - 4/21/2017 7:21
2100-AD-015-0066-JHA Released Installation and Removal of SE Annex Stay Bar - 4/21/2017 7:10
2100-AD-015-0068 Released Telescope Drive Testing For DESI RA E-Chain - 10/30/2017 20:26:16
2100-AD-015-0068-JHA Released Telescope Drive Testing For DESI RA E-Chain - 8/4/2017 15:17
2100-AD-015-0069 Released Mayall 4 Meter Dome Lockdown Procedure - 6/23/2017 20:23
2100-AD-015-0070 Released Removal of Surplus Generators from the KPNO Generator House - 6/23/2017 13:17
2100-AD-015-0070-JHA Released Removal of Surplus Generators from the KPNO Generator House - 6/23/2017 13:17
2100-AD-015-0072 Released 4M Fire Watch Procedures - 6/23/2017 20:16
2100-AD-015-0073 Released 4 Meter White Spot Panel Replacement - 8/2/2017 17:06
2100-AD-015-0073-JHA Released 4 Meter White Spot Panel Replacement - 8/2/2017 17:06
2100-AD-015-0074 Released Installation of the DESI Zenith Work Platforms - 3/16/2018 13:32:39
2100-AD-015-0074-JHA Released Installation of the DESI Zenith Work Platforms - 3/16/2018 14:20:02
2100-AD-015-0077 Released Preparation and Packaging the 4m Prime Focus Corrector for Long Term Storage - 10/30/2017 21:47:04
2100-AD-015-0077-JHA Released Preparation and Packaging the 4M PFC for Long-Term Storage - 10/30/2017 14:04:12
2100-AD-015-0079 Released DESI Procedure to Loosen Bolts and Pins on Existing Top Ring - 01/23/2018 13:40:42
2100-AD-015-0079-JHA Released DESI Procedure to Loosen Bolts and Pins on Existing Top Ring - 1/23/2018 14:04:12
2100-AD-015-0080 Released Procedure & JHA Installing DESI Top Ring and Cage on Mayall 4M Telescope A 11/26/2018 19:41:12
2100-AD-015-0080-CLP Released Installing DESI Top Ring and Cage on Mayall 4M Telescope - 11/26/2018 19:21:14
2100-AD-015-0081 Released East RA Work Platform Installation - 12/18/2017 11:42:59
2100-AD-015-0081-JHA Released East RA Work Platform Installation - 12/18/2017 11:42:59
2100-AD-015-0082 Released Declination Work Platform Installation - 01/03/2018 14:42:10
2100-AD-015-0082-JHA Released Declination Work Platform Installation - 01/09/2018 18:55:28
2100-AD-015-0083 Released 4m Cassegrain Cage Electronics and Cable Removal - 01/23/2018 12:19:58
2100-AD-015-0083-JHA Released 4m Cassegrain Cage Electronics and Cable Removal - 01/23/2018 12:27:52
2100-AD-015-0084 Released Installation of DESI Fiber View Camera - 03/22/2018 12:29:42
2100-AD-015-0084-JHA Released Installation of DESI Fiber View Camera - 03/22/2018 12:30:52
2100-AD-015-0085 Released DESI Temporary Cable Installation Procedure - 05/01/2018 18:09:30
2100-AD-015-0085-JHA Released DESI Temporary Cable Installation JHA - 05/01/2018 18:11:50
2100-AD-015-0086 Released 4M Cass Cage Electronics and Cable Installation (After Primary Mirror Installation) - 02/07/2018 15:31:02
2100-AD-015-0086-JHA Released 4M Cass Cage Electronics and Cable Installation - 02/07/2018 15:33:46
2100-AD-015-0088 Released Routing of the Prime Focus Cooling Lines - 01/23/2018 15:17:56
2100-AD-015-0088-JHA Released Routing of the Prime Focus Cooling Lines - 01/23/2018 15:22:14
2100-AD-015-0090 Released Mayall 4 Meter Pointing Camera Alignment Procedures - 01/31/2018 14:11:10
2100-AD-015-0090-JHA Released Mayall 4 Meter Pointing Camera Alignment Procedure - 01/31/2018 14:03:12
2100-AD-015-0091 Released DESI HA E-Chain Lower Guide Mods - 01/16/2018 17:47:38
2100-AD-015-0091-JHA Released DESI HA E-Chain Lower Guide Mods - 01/16/2018 18:01:28
2100-AD-015-0092 Released Cable Removal from West Dec and Installation Procedurea - 03/12/2018 11:24:40
2100-AD-015-0092-JHA Released Cable Removal from West Dec and Installation Procedure - 03/12/2018 11:25:35
2100-AD-015-0093 Released E-Stop Location, Event & Reset Procedure - 08/13/2018 13:32:50
2100-AD-015-0094 Released Barrel-Hexapod Lateral Transfer Procedure and JHA - 11/01/2018 20:37:28
2100-AD-015-0094-CLP Released Critical Lift Plan for Barrel-Hexapod Lateral Transfer Procedure - 11/01/2018 20:38:04
2100-AD-015-0095 Released Procedure and JHA for Shifting DESI Ring/Cage Assembly into Range for 50 T Dome Crane A 10/16/2018 14:34:46
2100-AD-015-0095-CLP Released Critical Lift Plan: Shifting DESI Ring/Cage Assembly into Range for 50 T Dome Crane - 10/11/2018 12:58:54
2100-AD-015-0098 Released Barrel-Hexapod into Cage Installation Procedure and JHA A 11/08/2018 13:43:59
2100-AD-015-0098-CLP1 Released Critical Lift Plan for Barrel-Hexapod Lateral Transfer Procedure - 11/07/2018 13:24:59
2100-AD-015-0098-CLP2 Released Critical Lift Plan for Barrel-Hexapod Lateral Transfer Procedure - 11/07/2018 13:25:00
3000-AD-015-0001 Released McMath 2015 SHUTDOWN SCHEDULE - 2/21/2017 14:44
3500-AD-015-0004 Released WIYN Primary Mirror Removal and Installation Procedure - 6/23/2017 12:51
3500-AD-015-0004-JHA Released WIYN Primary Mirror Removal and Installation Procedure - 6/23/2017 12:51
3500-AD-015-0005 Released WIYN Tertiary Mirror Removal and Installation Procedure - 6/23/2017 12:55
3500-AD-015-0005-JHA Released WIYN Tertiary Mirror Removal and Installation Procedure - 6/23/2017 12:55
3500-AD-015-0010 Released Hydra Installation Procedure - 4/21/2017 9:33
3500-AD-015-0010-JHA Released Hydra Installation Procedure - 4/21/2017 9:35
3500-AD-015-0011 Released Hydra Removal Procedure - 4/21/2017 10:03
3500-AD-015-0011-JHA Released Hydra Removal Procedure - >4/21/2017 10:03
3500-AD-015-0012 Released WIYN Primary Mirror Aluminizing Handling Procedure - 01/22/2018 20:52:30
3500-AD-015-0012-JHA Released WIYN Primary Mirror Aluminizing Handling Procedure - 01/22/2018 20:52:30
3500-AD-015-0013 Released ODI Dewar Removal and Installation - 7/25/2017 8:56
3500-AD-015-0013-JHA Released ODI Dewar Removal and Installation - 7/25/2017 8:56
5000-AD-015-0002 Released Replace 20'' Paramount ME with Paramount ME II - 2/12/2016 7:55
5000-AD-015-0002-JHA Released Replace 20'' in Paramount ME with Paramount ME II - 2/12/2016 8:02
5000-AD-015-0003 Released HACH 1720E Low Range Turbidimeter Calibration Procedures - 08/15/2018 10:34:11
5000-AD-015-0004 Released ROR 16'' Mount Removal and Installation A 9/18/2017 18:01
5000-AD-015-0004-JHA Released ROR 16'' Mount Removal and Installation - 7/24/2017 9:17
5000-AD-015-0005 Released ROR 16'' / VC 20'' Mirror Cleaning A 9/19/2017 16:48
5000-AD-015-0005-JHA Released ROR 16'' / VC 20'' Mirror Cleaning A 9/19/2017 16:50
5000-AD-015-0006 Released 20'' Mirror Removal and Installation - 7/24/2017 9:17
5000-AD-015-0006-JHA Released 20'' Mirror Removal and Installation - 7/24/2017 9:17
5000-AD-015-0007 Released DIMM Telescope Installation Procedure - 12/5/2017 8:50:09
5000-AD-015-0007-JHA Released DIMM Telescope Installation - 12/05/2017 8:50:05
9019-A1 Released PROCESS SPECIFICATION ADHESIVE BONDING - 07/09/71

DOCUMENTS IN DRAFT\REVISION OR REVIEW

>
Document Number Status Document Title Rev Modified
2000-AD-015-0004 Draft / Revision 2.1 Meter Primary Optics Removal Procedure Rev 2/12/2016 11:43
2000-AD-015-0004-JHA01 Draft / Revision JHA 2.1M PRIMARY OPTICS REMOVAL PROCEDURE Rev 2/12/2016 7:58
2000-AD-015-0005 Draft / Revision 2.1M Cass Secondary Mirror Removal Procedure Rev 2/12/2016 18:25
2000-AD-015-0020 Draft / Revision 2.1 Meter Optics Cleaning Procedure Rev 5/11/2016 10:40
2000-AD-015-0022 Draft / Revision 2.1 Meter Shutdown Schedule 2015 1/7/2016 14:38
2000-AD-015-0023 Draft / Revision 2.1 Meter f8 Secondary Optics Removal Procedure Rev 2/12/2016 11:39
2000-AD-015-0023-JHA01 Draft / Revision 2.1 Meter Secondary Optics Removal Rev 2/12/2016 8:01
2000-AD-015-0025 Draft / Revision Procedure for Evacuating and Purging KPNO 2 2/22/2017 9:23
2036-AD-015-0001 Draft / Revision 0.9m MIRROR HAND WASH PROCEDURE 2/20/2017 8:20
2036-AD-015-0002 Draft / Revision 36in MIRROR REMOVAL PROCEDURE 2/20/2017 8:18
2100-AD-015-0003 Draft / Revision 4M Mayall Maintenance Manual - 2/17/2017 9:17
2100-AD-015-0008 Draft / Revision 4 Meter TCS Encoder Alignment Procedure - 2/16/2017 7:41
2100-AD-015-0033 Draft / Revision 4 Meter Dome Rail Repair Procedure - 3/22/2016 13:11
2100-AD-015-0035 Draft / Revision TCS Encoder Tape/Heads Cleaning Procedure A 2/24/2016 18:59
2100-AD-015-0035-JHA Draft / Revision TCS Encoder Tape/Heads Cleaning Procedure Rev 2/18/2016 15:47
2100-AD-015-0037 Draft / Revision PROCEDURE LUBRICATION OF DECLINATION BEARINGS Rev 10/21/2016 09:32:16
2100-AD-015-0038 Draft / Revision 4m f8 VACUUM REGULATOR SETUP & AJUSTMENT PROCEDURE Rev 2/21/2017 11:29
2100-AD-015-0042 Draft / Revision Fiber Routing Procedure Rev 7/17/2018 15:37:04
2100-AD-015-0044 Draft / Revision Mayall Dome Rail Inspection Rev 4/12/2016 21:07
2100-AD-015-0054 Draft / Revision Procedure for the Removal of the f/15 Secondary from the 4m Mayall Prime Focus Assembly - 12/23/2016 8:33
2100-AD-015-0062 Draft / Revision DOME TRUCK SERVICE PLATFORM PROCEDURE 2/20/2017 12:24
2100-AD-015-0063 Draft / Revision 4m SET-UP OF HYDROSTATIC BEARINGS PROCEDURE 2/20/2017 15:09
2100-AD-015-0065 Draft / Revision 4M LOTO: Control of Energy Procedure 3/2/2017 10:56
2100-AD-015-0075 Draft / Revision Procedure for Preparation and Packing Mosaic 3 for Long Term Storage Rev 9/27/2017 16:14
2100-AD-015-0076 Draft / Revision Procedure for Preparation and Packing KOSMOS for Long Term Storage Rev 09/27/2017 09:14:55
2100-AD-015-0087 Draft / Revision Initial Mechanical Alignment of DESI Prime Focus Assembly on Mayall Rev 12/22/2017 14:31:56
2100-AD-015-0089 Draft / Revision Hydrostatic Bearing Tuning Rev 12/22/2017 15:06:48
2100-AD-015-0097 Draft / Revision DESI Top-Ring Vane Strain Gauge Installation Procedure Rev 10/15/2018 21:35:06
2205-AD-015-0001 Draft / Revision Aluminizing Chamber Fire Specifications 2/20/2017 15:46
2205-AD-015-0003 Draft / Revision 4M Aluminizing Chamber Startup Procedure 2/20/2017 23:00
3000-AD-015-0002 Draft / Revision McMath Pierce Shutdown Procedure Rev 2/12/2016 8:06
3500-AD-015-0001 Draft / Revision WIYN Optics Cleaning Procedure Rev 2/12/2016 10:42
3500-AD-015-0003 Draft / Revision WIYN Secondary Mirror Removal/Installation Procedure Rev 10/24/2016 13:56
3500-AD-015-0003-JHA01 Draft / Revision WIYN Secondary Mirror Removal/Install: Collimation: Azimuth Tuning Rev 9/14/2016 11:19
3500-AD-015-0006 Draft / Revision WIYN Collimation Procedure Rev 10/26/2016 16:25
3500-AD-015-0007 Draft / Revision Azimuth Axis Tuning and Encoder Alignment Procedure Rev 6/22/2016 15:22
3500-AD-015-0007-JHA01 Draft / Revision Azimuth Axis Tuning/Encoder Alignment Rev 7/11/2016 15:07
3500-AD-015-0008 Draft / Revision WIYN Summer Shutdown Schedule (This should not be a procedure) - 5/10/2016 12:24
3500-AD-015-0009 Draft / Revision Secondary Mirror Passive Seal Removal/Install Procedure Rev 10/26/2016 16:50
3500-AD-015-0014 Draft / Revision WHIRC Molecular Sieve Replacement Rev 11/30/2017
3500-AD-015-0015 Draft / Revision IAS, WTTM and WHIRC Installation Procedure Rev 06/08/2018
3500-AD-015-0019 Draft / Revision WIYN Secondary Lead Screw Cleaning Rev 08/14/2018
7000-AD-015-0001 Draft / Revision 50'' Hindle Sphere Mirror Handling Procedure Rev 2/12/2016 7:52
7000-AD-015-0002 Draft / Revision Procedure for Removing Evaporated Aluminum Coatings from Glass or Glass-Ceramic Mirrors Rev 1/24/2017 17:15
7000-AD-015-0002-JHA Draft / Revision First Surface Aluminum Coating Removal Procedure Rev 3/13/2017 9:29