kpno_ro
Contact jglaspey@noao.edu for conflicts.
August/September 2013
SundayMondayTuesdayWednesdayThursdayFridaySaturday
18Aug192021222324
 
 
 
 
Start Cooling Mosaic
Sec Flip F/8 to PF
 
25262728293031
 
Pump Newfirm
 
 
Sec Flip PF to F/8
 
 
1Sep234567
Labor Day
Cool Newfirm
 
Start Cooling Mosaic
Sec Flip F/8 to PF
 
891011121314
 
 
 
 
Pump FLMN
Sec Flip PF to F/8
 
15161718192021
 
Cool FLMN
Hydra Removal
IAS Install
Speckle Install
WHIRC Install
FLMN Install
Rotator/Guider Removal
Stay Bar In
Top Weights Installed
 
Ter Baffle Removal
 
22232425262728
 
 
 
Pump LB1A
Speckle Removal
Ter Baffle Install
LB1A Install
Rotator/Guider Install
STA3 Install
Stay Bar In
Top Weights Removed
 
Display:
Navigation Bar:
AbsoluteRelativeBothNeither
This Calendar:
System Options:
Home Login