SYSTEM DESIGN NOTE

SDN0014 - Handling and Instrument Service



 
 

Prepared by

Date 

Approved by

Date

Rev.

Rev Date

J Elias

5/27/99

N. Gaughan

6/1/99

 

 


 

1. Introduction

This SDN is intended to serve as somewhat of a “catch-all” by including a number of notes generally related to manipulation and handling of the instrument, both for operation at the telescope and for maintenance, repair, and alignment. The individual design notes are listed below by category.

2. Instrument Handling

Handling of the instrument as a whole, including installation at the telescope and manipulation within the Gemini facility, is described in SDN014.01, Instrument Handling.

3. Instrument Access

The design of the instrument must facilitate access for alignment, maintenance, and repair. Details of alignment procedures are not covered SDN014 and subsidiary design notes (see instead SDN003.20 and 003.21), nor are detailed service procedures (documentation TBD. However, and overview of access requirements for these purposes is given in SDN014.02, Instrument Access and Service. The same design note provides a summary of the design as it relates to instrument access. Requirements for handling of major mechanical and optical assemblies are also discussed.
 

 



If you have any questions or suggestions regarding this website, please contact Melissa Bowersock.

 

NOAO Intranet Services

NOAO Copyright
 Statement

National Optical Astronomy Observatories, 950 North Cherry Avenue, P.O. Box 26732, Tucson, Arizona 85726,
Phone: (520) 318-8000, Fax: (520) 318-8360