Many on the GNIRS team gave up the opportunity for a
four-day weekend and began fit checks with the entire bench on 7/5/02. |
 |
Using a hoist to pull the bench up into a vertical position
. . . |
 |
. . . the bench was then lowered into the bulkhead
(with Dick Joyce's guidance) . . . |
 |
. . . for a perfect fit. 7/5/02 |
 |
The active radiation shields with electrical connections.
9/02 |
 |
Connection port in the bulkhead. 9/02 |
 |
Cold straps with thermal link. 9/02 |
 |
Collimator, with Bill Ditsler, photographer. 9/02 |
 |
Cryocooler sub assembly. 9/02 |
 |
Starboard cryocooler manifold assembly. 9/02 |
 |
Detector focus assembly. 9/02 |
 |
Detector focus frame assembly. 9/02 |
 |
Filter wheel assembly. 9/02 |
 |
GNIRS aft view. 9/19/02 |
 |
GNIRS front view. 9/19/02 |
 |
GNIRS side view. 9/19/02 |
 |
GNIRS side view. 9/19/02 |
 |
Grating turret assembly. 9/02 |
 |
OIWFS assembly. 9/02 |
 |
Optical bench with grating installed. 9/02 |
 |
Optical bench integrated into forward bulk head. 9/02 |
 |
Ron George, Ken Don and Dick Joyce in the clean room.
9/19/02 |
 |
Paul Schmitt and Ron George "button up" the GNIRS
instrument in preparation for the cold tests. 9/20/02 |
 |
Paul and Ron finish buttoning up the instrument. 9/20/02 |
 |
The closed-up instrument being loaded with the thermal
enclosure boxes, inside the clean room. 9/23/02 |
 |
GNIRS with thermal enclosure boxes mounted. All we need is a
propeller on the front and we're ready for the Red Baron! 9/23/02 |
 |
GNIRS with front truss attached. 9/23/02 |
 |
On December 6, 2002, a Hook Crane was called in to pull the
fully assembled GNIRS instrument out of the lab and take it over to the
Flex Rig for testing. |
 |
Down in the "hole," Paul Schmitt and Ron George
hook the GNIRS handling assembly to the Hook Crane. 12/6/02 |
 |
Hooked up to the crane, GNIRS waits to be pulled up out of
the hole. 12/6/02 |
 |
With Ron George giving a little guidance, GNIRS begins being
lifted out of the lab by the Hook Crane. 12/6/02 |
 |
GNIRS sees the light of day. 12/6/02 |
 |
John Stein helps steady GNIRS as it comes up out of the
hole. 12/6/02 |
 |
GNIRS has wings! The instrument glides over to the Flex Rig
facility. 12/6/02 |
 |
GNIRS inside the Flex Rig facility. 12/6/02 |
 |
And GNIRS mounted on the Flex Rig, ready for testing.
12/6/02 |
Home | Management
| System Design Notes | Requirements
| Configuration Images
| Subsystems | Archives
| Staff | FTP
Site | Internal
Information
If you have any questions or suggestions regarding this website, please contact
Melissa Bowersock.
National Optical Astronomy Observatories,
950 North Cherry Avenue, P.O. Box 26732, Tucson, Arizona 85726,
Phone: (520) 318-8000, Fax: (520) 318-8360